OCGT is presented in two layers: an open conceptual base and two implementation guides. The first explains why the gap exists and how to measure it; the guides show how to run the work inside a project.

The white paper is the conceptual base. The implementation guides are the application: a sequence of activities, artefacts and decision criteria across the project life cycle.

White paper · free

Operational Capability Gap Theory (OCGT): Turning Project Delivery into Sustainable Operational Value

Reference document for the framework

Sets out the definition of the operational capability gap, the four pillars, the five value conversion routes, TVaR and the economic readiness gate.

What the document covers

  • Formal definition of the construct and its boundaries
  • The four pillars, with typical failure and measurement indicator
  • The five routes that convert the gap into economic value
  • TVaR as a reporting metric alongside CAPEX and schedule
  • The Economic Readiness Gate and the Gap Acceptance Register

Access the document

The download is immediate. Email is optional and used only to notify new technical publications.

If you prefer not to share it, simply start the download.

If the download does not start, use the direct link. PDF

Executive summary (2 pages)

02E-books

Implementation guides

Two implementation guides, one in each language, carry the readiness work inside the project. The English OCGT volume brings the framework together.

English

Operational Capability Gap Theory (OCGT): Turning Project Delivery into Sustainable Operational Value

A Practical Framework for Capital Projects from FEL to Stable Operations

States the construct of the operational capability gap, the four pillars, the five value conversion routes and TVaR as a reporting metric alongside CAPEX and schedule. The book carries the framework from FEL to stable operations, with the economic readiness gate as the decision point.

Sales link being configured

English

Operational Readiness in Your Large Capital Project

Implementation Guide

An implementation guide that integrates operational readiness and commissioning into the capital project life cycle. It organises activities, artefacts and decision criteria so that start-up is a planned milestone rather than a sequence of unexpected problems.

Portuguese

Prontidão Operacional em Seu Grande Projeto de Capital

Guia de Implementação

The Portuguese edition of the implementation guide. It systematises practical experience in large capital project management and describes how to integrate operational readiness and commissioning into the life cycle, focusing on what must be ready before first feed.

How data on this site is handled

Download records store date, time and language, and an email address only when it is provided with consent. The purpose is to measure interest in the material and to notify new technical publications.

Contact messages are used only to reply to that contact and are not shared with third parties.

Requests for access, correction or deletion can be made through the contact channel shown on the site.