Skip to content
Consulting

The operational capability gap is not resolved at commissioning.

Your project was delivered on time and on budget — and the plant still does not produce what it promised. The value that went missing was not lost in execution. It was lost in the gap between what the project delivered and what the operation can capture.

Readiness consulting is the application of the OCGT framework to a specific project: measure the capability gap, express it as economic value and decide what to close, when and at what cost. The work is technical and documented; it does not replace the project team or the operation.

01Consulting

Four readiness workstreams

The work is analytical, diagnostic and developmental. Each front is tied to one or more pillars of the framework, so that the agreed scope corresponds to an identifiable part of the gap.

01Pillars P1 to P4

Readiness Diagnosis (FEL-2/FEL-3)

A structured assessment of required capability against available capability, with quantified value at risk (TVaR) and prioritisation by value route.

  • Required capability defined per pillar
  • Gap map with documented evidence
  • TVaR by value route and in total
  • Decision report for the investment gate
02Pillars P2 and P3

Readiness Programme Structuring

A closure plan with owners, dates, estimated cost and acceptance criteria, integrated into the project schedule and the existing governance structure.

  • Closure plan per gap
  • Responsibility and interface matrix
  • Acceptance criteria and required evidence
  • Gate governance and acceptance register
03Pillar P1

Commissioning and Start-up Readiness

Start-up preparation: PSSR, integrated testing, release criteria and a ramp-up curve with verifiable weekly targets.

  • Commissioning and PSSR plan
  • Readiness criteria for first feed
  • Ramp-up curve with weekly targets
  • Contingency plan for foreseeable disturbances
04Pillar P2

Team Capability Building

Readiness training for project and operations teams, focused on decisions under uncertainty and on TVaR as a common language between functions.

  • Programme by function: project, operations, maintenance
  • Cases built on the client's own project
  • Reference material in English and Portuguese
  • Support through the first gates
02Extended scope

Engineering and cost management, with partners

The same approach of analysis, diagnosis and development applies to other project disciplines. In those cases JLD coordinates the technical work and delivery is shared with partner firms, always identified in the proposal.

05With partner

Project engineering

Analysis and diagnosis of project bases, premises and interfaces between disciplines, with a development plan that closes technical scope gaps before they reach execution.

  • Review of project bases and premises
  • Diagnosis of interfaces and execution risk
  • Engineering development plan
  • Technical opinion for the gate decision
06With partner

Cost management

Analysis and diagnosis of estimates, cost structure and control criteria, with a plan that makes cost predictable across the project life cycle.

  • Diagnosis of estimate and cost maturity
  • Work breakdown and measurement criteria
  • Control and predictability plan
  • Cost scenarios for decision

Third-party participation is disclosed before contracting. Technical responsibility for the diagnosis and for consolidating the result remains with JLD.

03Method

How I work

The sequence is the same at any project size. What changes is the depth of each step and the availability of data.

  1. 01

    Define required capability

    Translate the approved business case into operational capability per pillar: throughput, quality, availability, cost and required competence.

  2. 02

    Diagnose the gap

    Compare required capability with what the project and the operation actually deliver, using evidence rather than opinion.

  3. 03

    Quantify by value route

    Convert each material gap into economic value through volume, cost, capital, availability or schedule.

  4. 04

    Build the closure plan with cost and return

    Estimate closure cost at each phase and compare it with value at risk, with owners, dates and acceptance criteria.

  5. 05

    Govern through the economic gate

    Take the decision to the investment gate: close, close in phases, or accept with a formal record and monitoring.

Book a 30-minute conversation

The conversation is meant to check whether your project's gap can be measured with the information already available. It is not a sales presentation.

No quote form. The message goes directly to the author.

Consulting under structuring. The company is in the process of formalisation.