A project ends on paper before it ends in reality.

The Operational Capability Gap Theory measures the distance between installed capacity and demonstrated operating capability — and turns that distance into decisions, schedule and value.

Consulting

Operational readiness consulting — diagnostic, plan, coaching and monitoring, applied to your project.

See scope and deliverables
Installed capacity
Gap
Demonstrated capacity
L = 300.00 mH = 42,00 m
Reference elevation. The structure as built and the capability the operation sustains with evidence are not the same measurement.
01Core concept

The Operational Capability Gap

Required capability
Demonstrated available capability
Gap

Available capability is not what the organisation expects to have at start-up. It is the capability supported by current, traceable, verified evidence, accepted by those accountable for the operation.

The gap is dynamic. It can be closed and reopened with every change in scope, people, systems or boundary conditions. It must therefore be measured continuously, not audited once before start-up.

Measured with evidence, the gap stops being a start-up surprise and becomes an investment decision.

02Services

How we work

Four complementary workstreams, contracted separately or in sequence across the project.

01

Operational readiness diagnostic

Measurement of the current capability gap, with prioritised blockers and an executive report.

  • Blockers identified and ranked by criticality
  • Evidence by domain and by stage
  • Executive report with action priorities
02

Operational readiness and commissioning plan (ORP)

Plan structured by domain and stage, integrated with the project schedule.

  • Plan by domain and stage
  • Transfer and stabilisation criteria
  • Integration with schedule and governance
03

Coaching and capability building

Development of leaders and operating teams, with coaching applied to readiness decisions.

  • Leader and team development
  • Coaching on live project decisions
  • Knowledge transfer to the client team
04

Application monitoring

Periodic review of the Master Tracker and independent verification of evidence.

  • Master Tracker follow-up
  • Independent evidence review
  • Maturity and trend reporting

The consultancy does not execute engineering or technical commissioning. It structures, enables and governs readiness, preserving distinct technical authorities.

See the consulting scope
03Principles

The three laws

Three propositions govern every decision in the method, from diagnosis to stabilisation.

  1. I

    “Technical readiness is not operational readiness.”

    A system can be technically complete and still lack the people, procedures and evidence to operate it safely and steadily.

  2. II

    “The cost of closing a capability gap rises as start-up approaches.”

    Deferred decisions consume room to manoeuvre. The later a gap is identified, the more expensive and risky it becomes to close.

  3. III

    “Operational capability cannot be commissioned at the end of a project.”

    Capability is built across the life cycle, with people, processes and systems prepared and verified stage by stage.

04Method

Seven management stages

The seven stages are a management sequence, not project phases. They repeat at every decision cycle.

  1. 01

    Frame

    Define scope, readiness criteria and accountabilities.

  2. 02

    Mobilise

    Organise teams, resources and decision governance.

  3. 03

    Plan

    Translate the gap into blockers and traceable plans.

  4. 04

    Execute

    Close gaps through training, procedures and systems.

  5. 05

    Verify

    Confirm evidence independently of perception.

  6. 06

    Transfer

    Hand operational accountability to the organisation.

  7. 07

    Stabilise

    Sustain the operation and measure realised value.

05Technical scope

Six capability domains

The assessment covers the same domains in any sector. What changes is the vocabulary and the relative weight of each.

  • D1

    People and organisation

    Competence, roles and structure to operate.

  • D2

    Operations and processes

    Procedures, routines and operating performance.

  • D3

    Technology, data and systems

    Systems, integration and reliable data.

  • D4

    Maintenance, reliability and assets

    Plans, integrity and asset availability.

  • D5

    EHS, legal requirements and emergencies

    Safety, compliance and emergency response.

  • D6

    Documentation, supply and support

    Records, supply chain and operating support.

05 — Governance

Non-negotiable rule

No percentage overrides a blocker.

No aggregate percentage, readiness index, schedule pressure, cost consideration or residual-risk acceptance authorises progression while a blocker remains open without a formally recorded decision.

  • 01

    Master Tracker

    A single record of blockers, evidence and owners.

    Every progression decision is traced back to it.

  • 02

    Readiness Index

    Weighted items from 1 to 4, grouped into diagnostic bands.

    It guides prioritisation; it does not replace the blocker rule.

  • 03

    Five maturity levels

    From reacting to incidents to learning with prediction.

    Progress between levels requires evidence, not declaration.

Maturity levels

  1. Reactive
  2. Project-controlled
  3. Method-defined
  4. Evidence-managed
  5. Learning and prediction
07Evidence

Doctrine formulated, applied and in use.

  • Capital project application

    Large-scale industrial expansion

    Expansion project in the aluminium sector, in the order of BRL 650 million, with the operational readiness architecture created and applied.

  • Current application

    Operating industrial complex

    Method in continuous use in an operating alumina complex, for change and capability management.

  • Formulation

    Published theory

    Doctrine formalised and published in three works, in Portuguese and English.

Cases presented anonymously under confidentiality commitments. Claims of avoided cost or accelerated ramp-up require project-specific evidence and are not treated as universal outcomes.

08Publications

The conceptual base and its application

The white paper defines the framework. The implementation guides carry it into the project life cycle, with a sequence of activities and decision criteria.

Professional portrait of Jorge Luiz Dias
09Author

Jorge Luiz Dias

Creator of the Operational Capability Gap Theory

More than three decades in complex industrial environments and large capital projects, working across operations, maintenance, utilities and engineering interfaces. Degree in Business Administration, postgraduate qualification in Production Engineering and an MBA in Project Management.

  • 34 years in industry since 1992
  • 1 year in high-voltage electrical maintenance
  • MBA in Project Management
10Sectors

Where the method applies

Capital-intensive sectors where the transition from project to operation is decisive.

  • Mining and metals
  • Oil and gas
  • Chemicals and petrochemicals
  • Energy and utilities
  • Pulp and paper
  • Food and beverage
  • Pharmaceutical
  • Steel and cement
  • Infrastructure
  • Process manufacturing
  • Water and sanitation
  • Logistics and terminals

What changes between sectors is the vocabulary, not the nature of the gap.

Next step

Initial 60-minute diagnostic

A working conversation about a specific project or portfolio, to understand the current gap, the known blockers and what must be decided before start-up. No commitment and no sales presentation.